Tag: K-Frame

Railway Themed K-Frame Barrier on Weddington Walk

NBBC – Remove Your Restrictions!

With Sustrans wanting to improve its National Cycle Network including through the removal of discriminatory obstructions that hinder legitimate access, it would be nice if Nuneaton & Bedworth Borough Council would get on board with improving the sections of routes that it controls. Too many obstructions exist on the likes of Weddington Walk, Wembrook Trail, and access to the Coventry

Continue reading

Will COVID-19 Inspire a ‘New Normal’ in Local Transport?

One of the big positives to come out of the coronavirus crisis and the national lockdown has been an immediate shift in transport with a dramatic and very noticeable drop in motor vehicle transport. At one point road travel fell to levels not seen since the mid-1950s and although it has since increased, we’re still at 1970s levels. How can

Continue reading
K-Frame Barrier

K-Frame Barriers – Part 4: A Director Responds

The ongoing saga relating to access restrictions on cycle paths, specifically Nuneaton’s Weddington Walk (part of National Cycle Network Route 52) continues following receipt of a response to my questions, this time from a Council director. The contents of that reply are copied below. I was a little disappointed that the email was headed ‘Draft’ in the subject, almost like

Continue reading
K-Frame Barrier

K-Frame Barriers – Part 3: Information Not Held

Yesterday, I receive my long-awaited reply to last month’s follow up request for information relating to the use of K-frame barriers, specifically on Weddington Walk. The full allowance of twenty working days was used to provide me with the responses of either ‘we do not hold that information’ or ‘this is not a request for information.’

Continue reading
K-Frame - Weddington Walk (A444)

K-Frame Barriers – Part 2: The Council’s Response

In my last post on 24 July, I spoke about the obstructions present along NCN52, specifically in the form of K-Frame barriers on a section known locally as Weddington Walk. Having not received a satisfactory response from my general enquiry to Nuneaton and Bedworth Borough Council, I sent a message with a list of questions asked under the Freedom of

Continue reading
K-Frame Barrier

K-Frame Barriers on NCN52 (Weddington Walk)

There’s a generally rather nice section of National Cycle Network (NCN) route 52 as it leaves Nuneaton called Weddington Walk. This is an off-road shared path running along the route of an old railway line, heading up to the A5. I say generally nice, because whilst it’s reasonably wide, mostly quiet and properly surfaced with tarmac, it is hindered by

Continue reading
Find me on Mastodon